ELYntegration

Key Info

Basic Information

Partner:
Prof. Dr. Albert Moser
Faculty / Institution:
Electrical Engineering and Information Technology
Pillar:
Joint Technology Initiatives
Project duration:
01.09.2015 to 31.08.2018
EU contribution:
1.861.309 euros
  EU flag This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 671458.  

Title

Grid Integrated Multi Megawatt High Pressure Alkaline Electrolysers for Energy Applications

Concept

The strategic goal of the ELYntegration Project is the design and engineering of a robust, flexible, efficient and cost-competitive single stack Multimegawatt High Pressure Alkaline Water Electrolysis of 4,5 T H2/day capable to provide cutting-edge operational capabilities under highly dynamic power supplies expected in the frame of generation/ transmission/ distribution scenarios integrating high renewable energies (RE) shares.

Participants

  • Fundación Para El Desarrollo De Nuevas Technologías Del Hidrógeno En Aragón, Spain (Coordinator)
  • IHT Industrie Haute Technologie SA, Switzerland
  • Vlaamse Instelling Voor Technologisch Onderzoek N.V., Belgium
  • Fraunhofer-Gesellschaft zur Förderung der Angewandten Forschung e.V., Germany
  • Instrumentación y Componentes S.A., Spain